Jul
13
2016
Baltkonta UAB goes multi-modal
In August 2015, Baltkonta UAB together with Limarko UAB implemented a multi-modal project: the delivery of 14 units of over-sized tanks from Alytus, Lithuania, to Avonmouth in the U.K.
The lenght of each tank was 14 metres, width 4.2 metres and height 4 metres. Each of the tanks weighted 10 tons.
More information about the project in the newsletter Global Project Logistics Network (GPLN), page 5
http://www.gpln.net/Issue%20No46.pdf